News > Crack appears on NHAI's new road to Kuthiran tunnel
Crack appears on NHAI's new road to Kuthiran tunnel
![](https://static.toiimg.com/thumb/msid-96295522,width-1070,height-580,imgsize-895943,resizemode-75,overlay-toi_sw,pt-32,y_pad-40/photo.jpg)
17/12/2022 06:06 PM | Click to read full article
Formation of a crack on the national highway's Mannuthy-Wadakkanchery stretch has triggered anxiety among residents and road users. A crack, reportedly of about 5m, developed at Vazhakkumpara near Kuthiran tunnel on the NH stretch which was constructed at a cost of Rs 1,019 crore. One side of the road was constructed in a shoddy manner by using stones, even without proper cementing work, he said.